Monday, 22 June 2020

On the List



Now that we have Naughty-Cal back in the water after almost a year ashore we have a small list of little jobs that need sorting out. Nothing major, all little odds and sods of jobs really but stuff that needs sorting out before we start to plan any trips away. So far the list includes:

  • Fixing the diesel heating. We are waiting for the spare parts to arrive for this.
  • Fixing one of the burners on the hob. This has mysteriously broken but tracking down spare parts is proving tricky as the hob is now obsolete
  • Buying a fitting an adapter cable for the transducer to the sonar module. Again sourcing the right cable is proving difficult.
  • Installing new bulbs in the white nav lights. These have given up the ghost in the last year.
  • Rewiring the VHF aerial as the quick release connection has parted company with the cable. 
  • Checking the fuel filters. These were freshly changed before the boat came out of the water but now that we have run for a few hours we want to check them for dirt and debris that might indicate issues with the fuel.
  • Change the impellor. This has been damaged due to the pump not self priming when the boat was relaunched.
As you can see there is nothing major on the list but we would like to get some jobs crossed off before we can go anywhere too far.