So we have gone and done it again. We have left a long list
of jobs until the very last minute before we go away.
We have just one weekend
left to:
- · Install the new toilet
- · Polish the shower room
- · Fit the new shower curtain
- · Install the new shower sump float switch
- · Install the new shower sump box lid
- · Install the new LED light in the bathroom
- · Wash out the engine bay
- · Install the new transom shower hose
- · Install the new engine bay cover gas strut
- · Wash the boat
- · Clean the interior
- · Refill the diesel tank
It is going to be a stretch to get this little lot finished
in time for our extended four day bank holiday weekend cruise. Thankfully it is
only a local cruise this year to Muskham Ferry and Dunham Bridge but it would
still be nice to have the boat in full working order in time to go. We much
prefer it when everything is in full working order.
It is doubtful that we will get much cruising in this
weekend other than a run into Lincoln on Friday night for a few drinks in the
boat club. No doubt Naughty-Cal will enjoy the break though and enjoy some TLC.
No comments:
Post a Comment