Wednesday 14 August 2013

We Have Done It Again!


So we have gone and done it again. We have left a long list of jobs until the very last minute before we go away.

We have just one weekend left to:
  • ·         Install the new toilet
  • ·         Polish the shower room
  • ·         Fit the new shower curtain
  • ·         Install the new shower sump float switch
  • ·         Install the new shower sump box lid
  • ·         Install the new LED light in the bathroom
  • ·         Wash out the engine bay
  • ·         Install the new transom shower hose
  • ·         Install the new engine bay cover gas strut
  • ·         Wash the boat
  • ·         Clean the interior
  • ·         Refill the diesel tank

It is going to be a stretch to get this little lot finished in time for our extended four day bank holiday weekend cruise. Thankfully it is only a local cruise this year to Muskham Ferry and Dunham Bridge but it would still be nice to have the boat in full working order in time to go. We much prefer it when everything is in full working order.

It is doubtful that we will get much cruising in this weekend other than a run into Lincoln on Friday night for a few drinks in the boat club. No doubt Naughty-Cal will enjoy the break though and enjoy some TLC. 

No comments:

Post a Comment